The 3 litre SVS can be installed in approximately
one hour.
All of the needed hardware and Allen wrenches are
included with the unit.
A quick overview of the installation elements are:
-
Removal of the stock plenum cover
-
Removal of stock linkage
-
Installation of SVS base unit and slide
-
Installation of SVS progressive linkage
-
Linkage adjustment
NOTICE TO PURCHASER:
The SVS system is designed for high-performance use.
The user shall determine the suitability of the product for their
intended application, and user assumes all risks and liability in
connection therein. In no event shall Brucato Inc. be responsible for damages or injury from any source.
The following instructions should be read in its
entirety before beginning installation. If you are unsure of performing
any step described, please contact your dealer.
Installation Instructions:
1. |
Make sure the ignition
switch is off. Disconnect the battery cables at the battery. |
2. |
Refer to FIG
1: Unplug TPI harness A, injector harness C, remove air
temperature sensor B. |
3. |
Refer to FIG
3: Pull throttle actuator arm out of plastic clip F in throttle
advance cam. Remove locking nut G and remove throttle advance
cam. Set aside for later use. |
4. |
Refer to FIG
2: Remove two bolts D from vapor separator/cover plate.
Loosen (12) bolts E from cover plate. Remove all bolts but one.
Support plenum box while removing final bolt. Tilt bottom of
air box forward so as to remove cover assembly. |
5. |
Remove (6) #10 screws
from front of SVS. Remove cover assembly and slide assembly,
and set aside. |
6. |
Inspect intake manifold
to plenum box gaskets, replace if damaged. Inspect rubber seal
on front of plenum box to make sure it is positioned properly.
Position SVS base on plenum box, install (2) provided 8mm x
90mm Allen screws in bottom two holes. |
7. |
Align SVS/plenum box
with motor intake manifold. So as not to damage gasket, start
one of the 8mm screws. Install remaining screws, hand tighten.
Torque screws to 19-inch pounds, working from the center outward. |
8. |
Secure vapor separator
to SVS with bolts removed earlier, torque to 45-inch pounds. |
9. |
Reconnect TPI and injector
harness and replace air temperature sensor with (3) screws previously
removed. |
10. |
Refer to FIG
4: Insert slide assembly into SVS base. Be sure to correctly
insert brass bushing H of slide assembly into elongated slot
in linkage. |
11. |
Install SVS cover plate
assembly with (6) provided #10 screws and lock washers using
loctite, torque to 25-inch pounds. |
12. |
Refer to FIG
5: Liberally apply grease to throttle pivot shaft I. Install
provided spring J to screw on base linkage, and screw on throttle
cam linkage assembly K. Stretch linkage assembly onto throttle
pivot shaft I, aligning slot over bushing, FIG
6 N. Secure with lock nut removed earlier. Tighten lock
nut to make full contact, then back off 1/4 turn. |
13. |
Refer to FIG
3: Locate original throttle advance cam F previously removed,
remove plastic swivel by pushing a 5/16 socket over the back
of the swivel. Push plastic swivel into the new SVS advance
cam, FIG 6 L. Install steel throttle
linkage into plastic swivel L. |
14. |
Reconnect battery,
look over entire installation making sure no chafing of wires
or cables will occur. Install flywheel cover, refer to linkage
adjustments. |
Linkage Adjustments:
The following linkage adjustments are to ensure that
the original butterflies operate as originally designed, opening
and closing fully, and that the SVS opens fully, at wide-open throttle
and returns fully closed. These movements should operate smoothly
without binding or having any interference.
1. |
Refer to FIG
6: Back off stop screws O and P so as not to interfere with
travel of linkage assembly. Align marks on roller M with mark
on throttle advance cam. Check for .005-.010 inch clearance
between roller and cam. If necessary, adjust by loosening cam
follower screw and moving roller to position, then tighten screw. |
2. |
With throttle in idle
position, adjust screw P to achieve .010 inch clearance with
throttle advance cam. Tighten locking nut to prevent movement. |
3. |
Have an assistant operate
throttle to wide-open position. IMPORTANT: Original butterflies
MUST be wide open, if necessary, to adjust wide-open throttle
position. Refer to FIG 7: Loosen lock nut and adjust screw Q,
tighten lock nut. Operate throttle several times to ensure wide-open
throttle. |
4. |
Refer to FIG
6: With throttle in wide-open position, adjust stop screw
O to achieve wide-open throttle of SVS. Operate throttle several
times to ensure wide-open throttle. Tighten locking nut on screw
O to prevent movement. |
The SVS Stackable Velocity System is a registered
trademark and is patented under #5636612.
The SVS intake system is for use on 1997 or earlier
motors. For use on 1998 or newer models, application must be for
competitive use only. User must determine suitability and proper
use and assumes responsibility for use in all applications, including
compliance with EPA-regulation Emissions Inventory Improvement Program
(EIIP). Brucato, Inc. assumes no liability for
improper application or use of any SVS intake system.
Brucato, Inc.
4743 CHRISTIAN CHAPEL ROAD
NEW HILL, NORTH CAROLINA 27562
(919) 718-0249
FOR PRINTED COPIES OF THESE PAGES, PLEASE SELECT
FROM THE LINKS BELOW:
High Airflow Reed
Plate | System
Features | Test
Results | Articles | Instructions
& Installation Procedures | SVS Systems
| Home Page
|